MISTRI KHOLA 2 HYDROELECTRIC PROJECT (12 MW)

MEN received the survey license of Mistri Khola 2 Hydroelectric Project which is a cascade development of under construction Mistri Khola Hydroelectric Project on 2074 Srawan 29. The feasibility study was conducted by Hydro Consult Engineering. The connection agreement was signed with Nepal Electricity Authority and is in the process of Power Purchase Agreement (PPA).

Sailent Features of Tadi Khola HEP